Primary Recommendations
- Top 18 projects, scoring from 230.47 points to 203.56 points.
- Total Requests: $28,709,002 (Cleveland's Woodland Avenue, Phase II project would be short by $1,653,802)
- The Primary Recommendations include loan requests totaling $5,435,421 which exceeds the 20% minimum loan requirement of the State Capital Improvement Program (SCIP). The total loan requests for both the Primary and Secondary Recommendations is $7,315,793.
Secondary Recommendations (Contingency Recommendations)
- Projects ranked 19-28, between the first cutoff line and the end of the list on Page 2
- An additional $6,911,693 in requests and
- An additional $1,800,372,000 in loan requests.
No Recommendation
- Projects with a Project Specific Score of less than 1640.00 points were not included in the staff recommendations, but any of these projects may be brought up for special consideration by a DOPWIC member.
| APPLICANT | PROJECT I.D. | PROJECT NAME | LOAN REQUEST |
|---|---|---|---|
| Maple Heights | MAP 11-02 | Broadway Sanitary Interceptor | $91,860 |
| Maple Heights | MAP 11-01 | Broadway Avenue Reconstruction | $550,000 |
| Lakewood | LAK 11-02 | Athens Area Watermain Replacement | $162,777 |
| Glenwillow | GLW 11-02 | Richmond and Broadway Intersection | $353,664 |
| Rocky River | ROC 11-01 | Frazier Drive Sewer Improvement | $3,277,120 |
| North Royalton | NRO 11-01 | Bennett Road (CR 109) Improvement | $1,000,000 |
| Primary Recommendations | $5,435,421 | ||
| South Euclid | SOU 11-02 | Argonne Road Infrastructure Improvements. | $732,522 |
| Brecksville | BRE 11-02 | Weise Road Retaining Wall | $233,800 |
| Bedford | BED 11-01 | Grand, Franklin and Magnolia Watermain | $394,000 |
| Broadview Heights | BVH 11-03 | Short Avery Road Improvement | $270,050 |
| Hunting Valley | HTV 11-01 | Fairmount Boulevard Safety Upgrade | $250,000 |
| TOTAL | $7,315,793 | ||